EV charging station in East Hartford, Connecticut, not on a charging network — 4 Level 2. US DOE AFDC station 333994.

At a glance

893 Main Street is a public EV charging station at 893 Main St in East Hartford, Connecticut, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 26, 2023.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID333994
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateOct 26, 2023
Last updated at sourceJan 28, 2025

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
893 Main St
ZIP
06108
Coordinates
41.76997, -72.64372

Within ~15 km

Nearby charging

What kind of charging does 893 Main Street offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.

How does 893 Main Street compare with other stations in East Hartford?

East Hartford has 62 charging stations in the DOE registry with 138 ports, the 4th-most of 165 cities and towns in Connecticut. 893 Main Street accounts for 3% of the charging ports in East Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates 893 Main Street?

893 Main Street is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 26, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Jan 28, 2025.

Frequently asked questions

How many chargers does 893 Main Street have?

893 Main Street has 4 charging ports: 4 Level 2.

Does 893 Main Street have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does 893 Main Street have?

893 Main Street has J1772 connectors.

Is 893 Main Street open to the public?

Yes. 893 Main Street is listed with public access, and its status is available.

Where is 893 Main Street?

893 Main Street is at 893 Main St, East Hartford, CT 06108. Its coordinates are 41.76997, -72.64372.

More EV charging around East Hartford

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 333994, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “893 Main Street, East Hartford, CT (AFDC station 333994)”, https://chargecensus.com/stations/connecticut/893-main-street-333994 (data as of October 12, 2026).