62 Poquonock Ave, Windsor CT
AvailableEV charging station in Windsor, Connecticut, not on a charging network — 4 Level 2. US DOE AFDC station 334231.
At a glance
62 Poquonock Ave, Windsor CT is a public EV charging station at 62 Poquonock Ave in Windsor, Connecticut, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 11, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334231 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Aug 11, 2023 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 62 Poquonock Ave
- City
- Windsor
- State
- Connecticut
- ZIP
- 06095
- Coordinates
- 41.85477, -72.64601
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- Bradley Airport20 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Bramble Bush Circle14 ports
ChargeLab · Available
- Hartford Healthcare MOB Garage12 ports
AmpUp · Available
What kind of charging does 62 Poquonock Ave, Windsor CT offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does 62 Poquonock Ave, Windsor CT compare with other stations in Windsor?
Windsor has 13 charging stations in the DOE registry with 43 ports. 62 Poquonock Ave, Windsor CT accounts for 9% of the charging ports in Windsor. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 62 Poquonock Ave, Windsor CT?
62 Poquonock Ave, Windsor CT is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 11, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does 62 Poquonock Ave, Windsor CT have?
62 Poquonock Ave, Windsor CT has 4 charging ports: 4 Level 2.
Does 62 Poquonock Ave, Windsor CT have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does 62 Poquonock Ave, Windsor CT have?
62 Poquonock Ave, Windsor CT has J1772 connectors.
Is 62 Poquonock Ave, Windsor CT open to the public?
Yes. 62 Poquonock Ave, Windsor CT is listed with public access, and its status is available.
Where is 62 Poquonock Ave, Windsor CT?
62 Poquonock Ave, Windsor CT is at 62 Poquonock Ave, Windsor, CT 06095. Its coordinates are 41.85477, -72.64601.
More EV charging around Windsor
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334231, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “62 Poquonock Ave, Windsor CT, Windsor, CT (AFDC station 334231)”, https://chargecensus.com/stations/connecticut/62-poquonock-ave-windsor-ct-334231 (data as of October 12, 2026).