365 Willard Ave
AvailableEV charging station in Newington, Connecticut on the Loop network — 2 Level 2. US DOE AFDC station 399285.
At a glance
365 Willard Ave is a public EV charging station at 365 Willard Ave in Newington, Connecticut, on the Loop network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 22, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 399285 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Feb 22, 2023 |
| Last updated at source | Sep 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 365 Willard Ave
- City
- Newington
- State
- Connecticut
- ZIP
- 06111
- Coordinates
- 41.70867, -72.73617
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Destination · Available
Non-networked · Available
Tesla Supercharger · Available
What kind of charging does 365 Willard Ave offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.
How does 365 Willard Ave compare with other stations in Newington?
Newington has 7 charging stations in the DOE registry with 47 ports. 365 Willard Ave accounts for 4% of the charging ports in Newington. It is the only Loop station in Newington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 365 Willard Ave?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 172 of those stations are in Connecticut, 10% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 22, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.
Frequently asked questions
How many chargers does 365 Willard Ave have?
365 Willard Ave has 2 charging ports: 2 Level 2.
Does 365 Willard Ave have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 365 Willard Ave have?
365 Willard Ave has J1772 connectors.
Is 365 Willard Ave open to the public?
Yes. 365 Willard Ave is listed with public access, and its status is available.
Where is 365 Willard Ave?
365 Willard Ave is at 365 Willard Ave, Newington, CT 06111. Its coordinates are 41.70867, -72.73617.
More EV charging around Newington
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 399285, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “365 Willard Ave, Newington, CT (AFDC station 399285)”, https://chargecensus.com/stations/connecticut/365-willard-ave-399285 (data as of October 12, 2026).