ChargeCensus

283 Colonial Ave

Available

EV charging station in Waterbury, Connecticut, not on a charging network — 8 Level 2. US DOE AFDC station 333747.

At a glance

283 Colonial Ave is a public EV charging station at 283 Colonial Ave in Waterbury, Connecticut, not attached to a charging network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 19, 2023.

Total ports
8
DC fast
0
Level 2
8
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID333747
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateOct 19, 2023
Last updated at sourceFeb 12, 2025

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
283 Colonial Ave
ZIP
06704
Coordinates
41.58680, -73.06076

Within ~15 km

Nearby charging

What kind of charging does 283 Colonial Ave offer?

Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.6 times the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.

How does 283 Colonial Ave compare with other stations in Waterbury?

Waterbury has 42 charging stations in the DOE registry with 144 ports, the 7th-most of 165 cities and towns in Connecticut. 283 Colonial Ave accounts for 6% of the charging ports in Waterbury. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates 283 Colonial Ave?

283 Colonial Ave is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Feb 12, 2025.

Frequently asked questions

How many chargers does 283 Colonial Ave have?

283 Colonial Ave has 8 charging ports: 8 Level 2.

Does 283 Colonial Ave have DC fast charging?

No. The registry lists no DC fast ports here; its 8 ports are all Level 2.

What connectors does 283 Colonial Ave have?

283 Colonial Ave has J1772 connectors.

Is 283 Colonial Ave open to the public?

Yes. 283 Colonial Ave is listed with public access, and its status is available.

Where is 283 Colonial Ave?

283 Colonial Ave is at 283 Colonial Ave, Waterbury, CT 06704. Its coordinates are 41.58680, -73.06076.

More EV charging around Waterbury

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 333747, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “283 Colonial Ave, Waterbury, CT (AFDC station 333747)”, https://chargecensus.com/stations/connecticut/283-colonial-ave-333747 (data as of October 12, 2026).