27 A Pleasant Street
AvailableEV charging station in East Windsor, Connecticut, not on a charging network — 4 Level 2. US DOE AFDC station 333735.
At a glance
27 A Pleasant Street is a public EV charging station at 27 Pleasant St in East Windsor, Connecticut, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 18, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 333735 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Dec 18, 2023 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 27 Pleasant St
- City
- East Windsor
- State
- Connecticut
- ZIP
- 06088
- Coordinates
- 41.93338, -72.61406
Within ~15 km
Nearby charging
- Bradley Airport20 ports
AmpUp · Available
Tesla Supercharger · Available
- Bramble Bush Circle14 ports
ChargeLab · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Enfield, CT - Tesla Supercharger12 ports
Tesla Supercharger · Available
What kind of charging does 27 A Pleasant Street offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does 27 A Pleasant Street compare with other stations in East Windsor?
East Windsor has 4 charging stations in the DOE registry with 10 ports. 27 A Pleasant Street accounts for 40% of the charging ports in East Windsor. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 27 A Pleasant Street?
27 A Pleasant Street is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 18, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does 27 A Pleasant Street have?
27 A Pleasant Street has 4 charging ports: 4 Level 2.
Does 27 A Pleasant Street have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does 27 A Pleasant Street have?
27 A Pleasant Street has J1772 connectors.
Is 27 A Pleasant Street open to the public?
Yes. 27 A Pleasant Street is listed with public access, and its status is available.
Where is 27 A Pleasant Street?
27 A Pleasant Street is at 27 Pleasant St, East Windsor, CT 06088. Its coordinates are 41.93338, -72.61406.
More EV charging around East Windsor
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 333735, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “27 A Pleasant Street, East Windsor, CT (AFDC station 333735)”, https://chargecensus.com/stations/connecticut/27-a-pleasant-street-333735 (data as of October 12, 2026).