250 North
AvailableEV charging station in New Britain, Connecticut, not on a charging network — 4 Level 2. US DOE AFDC station 333720.
At a glance
250 North is a public EV charging station at 250 North St in New Britain, Connecticut, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 21, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 333720 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Jul 21, 2023 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 250 North St
- City
- New Britain
- State
- Connecticut
- ZIP
- 06051
- Coordinates
- 41.67400, -72.77376
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
- 1251 Farmington Ave24 ports
Loop · Available
Tesla Destination · Available
- Bristol Events Center16 ports
Flash · Available
What kind of charging does 250 North offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does 250 North compare with other stations in New Britain?
New Britain has 41 charging stations in the DOE registry with 146 ports, the 10th-most of 165 cities and towns in Connecticut. 250 North accounts for 3% of the charging ports in New Britain. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 250 North?
250 North is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 21, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does 250 North have?
250 North has 4 charging ports: 4 Level 2.
Does 250 North have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does 250 North have?
250 North has J1772 connectors.
Is 250 North open to the public?
Yes. 250 North is listed with public access, and its status is available.
Where is 250 North?
250 North is at 250 North St, New Britain, CT 06051. Its coordinates are 41.67400, -72.77376.
More EV charging around New Britain
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 333720, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “250 North, New Britain, CT (AFDC station 333720)”, https://chargecensus.com/stations/connecticut/250-north-333720 (data as of October 12, 2026).