240 Oak St
AvailableEV charging station in Bridgeport, Connecticut, not on a charging network — 4 Level 2. US DOE AFDC station 334140.
At a glance
240 Oak St is a public EV charging station at 240 Oak St in Bridgeport, Connecticut, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 10, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334140 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Aug 10, 2023 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 240 Oak St
- City
- Bridgeport
- State
- Connecticut
- ZIP
- 06604
- Coordinates
- 41.18730, -73.20126
Within ~15 km
Nearby charging
- Town Of Fairfield20 ports
AmpUp · Available
Tesla Supercharger · Available
- 855 Main St16 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does 240 Oak St offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does 240 Oak St compare with other stations in Bridgeport?
Bridgeport has 24 charging stations in the DOE registry with 96 ports, the 20th-most of 165 cities and towns in Connecticut. 240 Oak St accounts for 4% of the charging ports in Bridgeport. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 240 Oak St?
240 Oak St is listed as non-networked: its chargers are not run through a charging-network account. Connecticut has 338 non-networked stations, 19% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 10, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does 240 Oak St have?
240 Oak St has 4 charging ports: 4 Level 2.
Does 240 Oak St have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does 240 Oak St have?
240 Oak St has J1772 connectors.
Is 240 Oak St open to the public?
Yes. 240 Oak St is listed with public access, and its status is available.
Where is 240 Oak St?
240 Oak St is at 240 Oak St, Bridgeport, CT 06604. Its coordinates are 41.18730, -73.20126.
More EV charging around Bridgeport
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334140, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “240 Oak St, Bridgeport, CT (AFDC station 334140)”, https://chargecensus.com/stations/connecticut/240-oak-st-334140 (data as of October 12, 2026).