EV charging station in Norwalk, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 256956.

At a glance

200 Ct Ave Rlty Visitor Parking is a public EV charging station at 200 US-1 in Norwalk, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 24, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID256956
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 24, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
200 US-1
ZIP
06854
Coordinates
41.10468, -73.43204

Within ~15 km

Nearby charging

What kind of charging does 200 Ct Ave Rlty Visitor Parking offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 200 Ct Ave Rlty Visitor Parking compare with other stations in Norwalk?

Norwalk has 31 charging stations in the DOE registry with 121 ports, the 16th-most of 165 cities and towns in Connecticut. 200 Ct Ave Rlty Visitor Parking accounts for 2% of the charging ports in Norwalk. ChargePoint runs 11 stations in Norwalk. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates 200 Ct Ave Rlty Visitor Parking?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 24, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 200 Ct Ave Rlty Visitor Parking have?

200 Ct Ave Rlty Visitor Parking has 2 charging ports: 2 Level 2.

Does 200 Ct Ave Rlty Visitor Parking have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 200 Ct Ave Rlty Visitor Parking have?

200 Ct Ave Rlty Visitor Parking has J1772 connectors.

Is 200 Ct Ave Rlty Visitor Parking open to the public?

Yes. 200 Ct Ave Rlty Visitor Parking is listed with public access, and its status is available.

Where is 200 Ct Ave Rlty Visitor Parking?

200 Ct Ave Rlty Visitor Parking is at 200 US-1, Norwalk, CT 06854. Its coordinates are 41.10468, -73.43204.

More EV charging around Norwalk

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 256956, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “200 Ct Ave Rlty Visitor Parking, Norwalk, CT (AFDC station 256956)”, https://chargecensus.com/stations/connecticut/200-ct-ave-rlty-visitor-parking-256956 (data as of October 12, 2026).