164 Water St. 164 Water St #1
AvailableEV charging station in Norwalk, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 306432.
At a glance
164 Water St. 164 Water St #1 is a public EV charging station at 164 CT-136 in Norwalk, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 5, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 306432 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 5, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 164 CT-136
- City
- Norwalk
- State
- Connecticut
- ZIP
- 06854
- Coordinates
- 41.09274, -73.41459
Within ~15 km
Nearby charging
- 18 Dock St46 ports
Loop · Available
- Stamford Parking Garage38 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Vdrs12 ports
FLO · Available
What kind of charging does 164 Water St. 164 Water St #1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 164 Water St. 164 Water St #1 compare with other stations in Norwalk?
Norwalk has 31 charging stations in the DOE registry with 121 ports, the 16th-most of 165 cities and towns in Connecticut. 164 Water St. 164 Water St #1 accounts for 2% of the charging ports in Norwalk. ChargePoint runs 11 stations in Norwalk. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 164 Water St. 164 Water St #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 5, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 164 Water St. 164 Water St #1 have?
164 Water St. 164 Water St #1 has 2 charging ports: 2 Level 2.
Does 164 Water St. 164 Water St #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 164 Water St. 164 Water St #1 have?
164 Water St. 164 Water St #1 has J1772 connectors.
Is 164 Water St. 164 Water St #1 open to the public?
Yes. 164 Water St. 164 Water St #1 is listed with public access, and its status is available.
Where is 164 Water St. 164 Water St #1?
164 Water St. 164 Water St #1 is at 164 CT-136, Norwalk, CT 06854. Its coordinates are 41.09274, -73.41459.
More EV charging around Norwalk
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 306432, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “164 Water St. 164 Water St #1, Norwalk, CT (AFDC station 306432)”, https://chargecensus.com/stations/connecticut/164-water-st-164-water-st-1-306432 (data as of October 12, 2026).