ChargeCensus

12 Sycamore EV

Available

EV charging station in Branford, Connecticut on the AmpUp network — 4 Level 2. US DOE AFDC station 262090.

At a glance

12 Sycamore EV is a public EV charging station at 12 Sycamore Way in Branford, Connecticut, on the AmpUp network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 6, 2023.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID262090
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityAuto Repair
Open dateJan 6, 2023
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.47 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
12 Sycamore Way
ZIP
06405
Coordinates
41.30085, -72.75154

Within ~15 km

Nearby charging

What kind of charging does 12 Sycamore EV offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.47 per kWh”. The site is listed as a auto repair location.

How does 12 Sycamore EV compare with other stations in Branford?

Branford has 26 charging stations in the DOE registry with 52 ports, the 19th-most of 165 cities and towns in Connecticut. 12 Sycamore EV accounts for 8% of the charging ports in Branford. It is the only AmpUp station in Branford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates 12 Sycamore EV?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 6, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does 12 Sycamore EV have?

12 Sycamore EV has 4 charging ports: 4 Level 2.

Does 12 Sycamore EV have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does 12 Sycamore EV have?

12 Sycamore EV has J1772 connectors.

Is charging at 12 Sycamore EV free?

Pricing as reported to the DOE registry: $0.47 per kWh.

Is 12 Sycamore EV open to the public?

Yes. 12 Sycamore EV is listed with public access, and its status is available.

Where is 12 Sycamore EV?

12 Sycamore EV is at 12 Sycamore Way, Branford, CT 06405. Its coordinates are 41.30085, -72.75154.

More EV charging around Branford

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 262090, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “12 Sycamore EV, Branford, CT (AFDC station 262090)”, https://chargecensus.com/stations/connecticut/12-sycamore-ev-262090 (data as of October 12, 2026).