100 Columbus Blvd - Level 1
AvailableEV charging station in Hartford, Connecticut on the AmpUp network — 6 Level 2. US DOE AFDC station 335309.
At a glance
100 Columbus Blvd - Level 1 is a public EV charging station at 100 Columbus Blvd in Hartford, Connecticut, on the AmpUp network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 12, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 335309 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Convention Center |
| Open date | Mar 12, 2024 |
| Last updated at source | Oct 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Columbus Blvd
- City
- Hartford
- State
- Connecticut
- ZIP
- 06103
- Coordinates
- 41.76292, -72.66771
Within ~15 km
Nearby charging
- Collins Parking Garage40 ports
AmpUp · Available
- SWTCH Energy32 ports
SWTCH · Available
- DOT Public EV Stations30 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- 1222 Stanley Street12 ports
Non-networked · Available
What kind of charging does 100 Columbus Blvd - Level 1 offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a convention center location.
How does 100 Columbus Blvd - Level 1 compare with other stations in Hartford?
Hartford has 147 charging stations in the DOE registry with 483 ports, the 2nd-most of 165 cities and towns in Connecticut. 100 Columbus Blvd - Level 1 accounts for 1% of the charging ports in Hartford. AmpUp runs 24 stations in Hartford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates 100 Columbus Blvd - Level 1?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 12, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 2, 2026.
Frequently asked questions
How many chargers does 100 Columbus Blvd - Level 1 have?
100 Columbus Blvd - Level 1 has 6 charging ports: 6 Level 2.
Does 100 Columbus Blvd - Level 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does 100 Columbus Blvd - Level 1 have?
100 Columbus Blvd - Level 1 has J1772 connectors.
Is 100 Columbus Blvd - Level 1 open to the public?
Yes. 100 Columbus Blvd - Level 1 is listed with public access, and its status is available.
Where is 100 Columbus Blvd - Level 1?
100 Columbus Blvd - Level 1 is at 100 Columbus Blvd, Hartford, CT 06103. Its coordinates are 41.76292, -72.66771.
More EV charging around Hartford
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 335309, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “100 Columbus Blvd - Level 1, Hartford, CT (AFDC station 335309)”, https://chargecensus.com/stations/connecticut/100-columbus-blvd-level-1-335309 (data as of October 12, 2026).