ChargeCensus

100 Center St

Available

EV charging station in Wallingford, Connecticut on the Epic Charging network — 1 Level 2. US DOE AFDC station 351622.

At a glance

100 Center St is a public EV charging station at 100 Center St in Wallingford, Connecticut, on the Epic Charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 1, 2024.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID351622
NetworkEpic Charging
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateJul 1, 2024
Last updated at sourceJun 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.33 per kWh

Charging network

Epic Charging

Operates 26 stations in the DOE registry — view the full network →

Location

Address
100 Center St
ZIP
06492
Coordinates
41.45613, -72.82211

Within ~15 km

Nearby charging

What kind of charging does 100 Center St offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 67% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.33 per kWh”. The site is listed as a parking lot location.

How does 100 Center St compare with other stations in Wallingford?

Wallingford has 20 charging stations in the DOE registry with 44 ports, the 24th-most of 165 cities and towns in Connecticut. 100 Center St accounts for 2% of the charging ports in Wallingford. It is the only Epic Charging station in Wallingford. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates 100 Center St?

Epic Charging operates 26 stations in the registry across 16 states, with 2 DC fast and 133 Level 2 ports in total. 1 of those stations are in Connecticut, under 1% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 1, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Jun 12, 2026.

Frequently asked questions

How many chargers does 100 Center St have?

100 Center St has 1 charging port: 1 Level 2.

Does 100 Center St have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does 100 Center St have?

100 Center St has J1772 connectors.

Is charging at 100 Center St free?

Pricing as reported to the DOE registry: $0.33 per kWh.

Is 100 Center St open to the public?

Yes. 100 Center St is listed with public access, and its status is available.

Where is 100 Center St?

100 Center St is at 100 Center St, Wallingford, CT 06492. Its coordinates are 41.45613, -72.82211.

More EV charging around Wallingford

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 351622, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “100 Center St, Wallingford, CT (AFDC station 351622)”, https://chargecensus.com/stations/connecticut/100-center-st-351622 (data as of October 12, 2026).