Second Presbyterian Church
AvailableEV charging station in Little Rock, Arkansas, not on a charging network — 2 Level 2. US DOE AFDC station 146724.
At a glance
Second Presbyterian Church is a public EV charging station at 600 Pleasant Valley Dr in Little Rock, Arkansas, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 6, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 146724 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Place of worship |
| Open date | Oct 6, 2019 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 600 Pleasant Valley Dr
- City
- Little Rock
- State
- Arkansas
- ZIP
- 72227
- Coordinates
- 34.78595, -92.38873
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Supercharger · Available
Electrify America · Available
Tesla Destination · Available
IONNA · Available
Non-networked · Available
What kind of charging does Second Presbyterian Church offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Arkansas average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a place of worship location.
How does Second Presbyterian Church compare with other stations in Little Rock?
Little Rock has 89 charging stations in the DOE registry with 230 ports, the most of 82 cities and towns in Arkansas. Second Presbyterian Church accounts for under 1% of the charging ports in Little Rock. Statewide, Arkansas has 423 stations and 1,185 ports, the 37th-largest station count of the 51 states and DC. The biggest station in Arkansas, NARA Parking Deck in Bentonville, has 24 ports.
Who operates Second Presbyterian Church?
Second Presbyterian Church is listed as non-networked: its chargers are not run through a charging-network account. Arkansas has 78 non-networked stations, 18% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 6, 2019, one of 17 stations in Arkansas with a 2019 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does Second Presbyterian Church have?
Second Presbyterian Church has 2 charging ports: 2 Level 2.
Does Second Presbyterian Church have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Second Presbyterian Church have?
Second Presbyterian Church has J1772 connectors.
Is charging at Second Presbyterian Church free?
Pricing as reported to the DOE registry: Free.
Is Second Presbyterian Church open to the public?
Yes. Second Presbyterian Church is listed with public access, and its status is available.
Where is Second Presbyterian Church?
Second Presbyterian Church is at 600 Pleasant Valley Dr, Little Rock, AR 72227. Its coordinates are 34.78595, -92.38873.
More EV charging around Little Rock
Working with Arkansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 146724, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Second Presbyterian Church, Little Rock, AR (AFDC station 146724)”, https://chargecensus.com/stations/arkansas/second-presbyterian-church-146724 (data as of October 12, 2026).