Pulaskicounty Admin Bldg 2
AvailableEV charging station in Little Rock, Arkansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 375276.
At a glance
Pulaskicounty Admin Bldg 2 is a public EV charging station at 201 Broadway St in Little Rock, Arkansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 9, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 375276 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 9, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 201 Broadway St
- City
- Little Rock
- State
- Arkansas
- ZIP
- 72201
- Coordinates
- 34.74745, -92.27520
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Destination · Available
Tesla Supercharger · Available
Tesla Destination · Available
IONNA · Available
Electrify America · Available
What kind of charging does Pulaskicounty Admin Bldg 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Arkansas average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pulaskicounty Admin Bldg 2 compare with other stations in Little Rock?
Little Rock has 89 charging stations in the DOE registry with 230 ports, the most of 82 cities and towns in Arkansas. Pulaskicounty Admin Bldg 2 accounts for under 1% of the charging ports in Little Rock. ChargePoint runs 52 stations in Little Rock. Statewide, Arkansas has 423 stations and 1,185 ports, the 37th-largest station count of the 51 states and DC. The biggest station in Arkansas, NARA Parking Deck in Bentonville, has 24 ports.
Who operates Pulaskicounty Admin Bldg 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in Arkansas, 36% of the state's 423.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 9, 2025, one of 54 stations in Arkansas with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pulaskicounty Admin Bldg 2 have?
Pulaskicounty Admin Bldg 2 has 2 charging ports: 2 Level 2.
Does Pulaskicounty Admin Bldg 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pulaskicounty Admin Bldg 2 have?
Pulaskicounty Admin Bldg 2 has J1772 connectors.
Is Pulaskicounty Admin Bldg 2 open to the public?
Yes. Pulaskicounty Admin Bldg 2 is listed with public access, and its status is available.
Where is Pulaskicounty Admin Bldg 2?
Pulaskicounty Admin Bldg 2 is at 201 Broadway St, Little Rock, AR 72201. Its coordinates are 34.74745, -92.27520.
More EV charging around Little Rock
Working with Arkansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 375276, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pulaskicounty Admin Bldg 2, Little Rock, AR (AFDC station 375276)”, https://chargecensus.com/stations/arkansas/pulaskicounty-admin-bldg-2-375276 (data as of October 12, 2026).