ChargeCensus

Markmartinkia Abb Level2

Available

EV charging station in Batesville, Arkansas on the ChargePoint network — 1 DC fast. US DOE AFDC station 217212.

At a glance

Markmartinkia Abb Level2 is a public EV charging station at 1601 Batesville Boulevard in Batesville, Arkansas, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 8, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID217212
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 8, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1601 Batesville Boulevard
City
Batesville
ZIP
72501
Coordinates
35.71417, -91.63238

Within ~15 km

Nearby charging

What kind of charging does Markmartinkia Abb Level2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 64% below the Arkansas average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Markmartinkia Abb Level2 compare with other stations in Batesville?

Batesville has 8 charging stations in the DOE registry with 29 ports, the 13th-most of 82 cities and towns in Arkansas. Markmartinkia Abb Level2 accounts for 3% of the charging ports in Batesville. ChargePoint runs 2 stations in Batesville. Statewide, Arkansas has 423 stations and 1,185 ports, the 37th-largest station count of the 51 states and DC. The biggest station in Arkansas, NARA Parking Deck in Bentonville, has 24 ports.

Who operates Markmartinkia Abb Level2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in Arkansas, 36% of the state's 423.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 8, 2022, one of 57 stations in Arkansas with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Markmartinkia Abb Level2 have?

Markmartinkia Abb Level2 has 1 charging port: 1 DC fast.

Does Markmartinkia Abb Level2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Markmartinkia Abb Level2, with CCS connectors.

What connectors does Markmartinkia Abb Level2 have?

Markmartinkia Abb Level2 has CCS connectors.

Is Markmartinkia Abb Level2 open to the public?

Yes. Markmartinkia Abb Level2 is listed with public access, and its status is available.

Where is Markmartinkia Abb Level2?

Markmartinkia Abb Level2 is at 1601 Batesville Boulevard, Batesville, AR 72501. Its coordinates are 35.71417, -91.63238.

More EV charging around Batesville

Working with Arkansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 217212, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Markmartinkia Abb Level2, Batesville, AR (AFDC station 217212)”, https://chargecensus.com/stations/arkansas/markmartinkia-abb-level2-217212 (data as of October 12, 2026).