Gwatney Buick GMC
AvailableEV charging station in North Little Rock, Arkansas on the Blink network — 4 DC fast. US DOE AFDC station 213447.
At a glance
Gwatney Buick GMC is a public EV charging station at 5700 Landers Rd. in North Little Rock, Arkansas, on the Blink network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Apr 5, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 213447 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 5, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: Free
Location
- Address
- 5700 Landers Rd.
- State
- Arkansas
- ZIP
- 72117
- Coordinates
- 34.80760, -92.20703
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Tesla Destination · Available
Tesla Destination · Available
Tesla Destination · Available
- Philander Smith University4 ports
evGateway · Available
What kind of charging does Gwatney Buick GMC offer?
Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 43% above the Arkansas average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. Pricing as reported to the registry: “Free”.
How does Gwatney Buick GMC compare with other stations in North Little Rock?
North Little Rock has 23 charging stations in the DOE registry with 68 ports, the 4th-most of 82 cities and towns in Arkansas. Gwatney Buick GMC accounts for 6% of the charging ports in North Little Rock. Blink runs 2 stations in North Little Rock. Statewide, Arkansas has 423 stations and 1,185 ports, the 37th-largest station count of the 51 states and DC. The biggest station in Arkansas, NARA Parking Deck in Bentonville, has 24 ports.
Who operates Gwatney Buick GMC?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 57 of those stations are in Arkansas, 13% of the state's 423.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 5, 2022, one of 57 stations in Arkansas with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gwatney Buick GMC have?
Gwatney Buick GMC has 4 charging ports: 4 DC fast.
Does Gwatney Buick GMC have DC fast charging?
Yes. The registry lists 4 DC fast ports at Gwatney Buick GMC, with CCS connectors.
What connectors does Gwatney Buick GMC have?
Gwatney Buick GMC has CCS connectors.
Is charging at Gwatney Buick GMC free?
Pricing as reported to the DOE registry: Free.
Is Gwatney Buick GMC open to the public?
Yes. Gwatney Buick GMC is listed with public access, and its status is available.
Where is Gwatney Buick GMC?
Gwatney Buick GMC is at 5700 Landers Rd., North Little Rock, AR 72117. Its coordinates are 34.80760, -92.20703.
More EV charging around North Little Rock
Working with Arkansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 213447, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gwatney Buick GMC, North Little Rock, AR (AFDC station 213447)”, https://chargecensus.com/stations/arkansas/gwatney-buick-gmc-213447 (data as of October 12, 2026).