ChargeCensus

Days Inn and Suites by Wyndham Cabot

Available

EV charging station in Cabot, Arkansas on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391355.

At a glance

Days Inn and Suites by Wyndham Cabot is a public EV charging station at 1302 West Locust Street in Cabot, Arkansas, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 19, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID391355
NetworkRivian Waypoints
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateOct 19, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Rivian Waypoints

Operates 207 stations in the DOE registry — view the full network →

Location

Address
1302 West Locust Street
City
Cabot
ZIP
72023
Coordinates
34.98077, -92.03011

Within ~15 km

Nearby charging

What kind of charging does Days Inn and Suites by Wyndham Cabot offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Arkansas average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Days Inn and Suites by Wyndham Cabot compare with other stations in Cabot?

Cabot has 3 charging stations in the DOE registry with 12 ports. Days Inn and Suites by Wyndham Cabot accounts for 17% of the charging ports in Cabot. It is the only Rivian Waypoints station in Cabot. Statewide, Arkansas has 423 stations and 1,185 ports, the 37th-largest station count of the 51 states and DC. The biggest station in Arkansas, NARA Parking Deck in Bentonville, has 24 ports.

Who operates Days Inn and Suites by Wyndham Cabot?

Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 3 of those stations are in Arkansas, under 1% of the state's 423.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2023, one of 114 stations in Arkansas with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Days Inn and Suites by Wyndham Cabot have?

Days Inn and Suites by Wyndham Cabot has 2 charging ports: 2 Level 2.

Does Days Inn and Suites by Wyndham Cabot have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Days Inn and Suites by Wyndham Cabot have?

Days Inn and Suites by Wyndham Cabot has J1772 connectors.

Is Days Inn and Suites by Wyndham Cabot open to the public?

Yes. Days Inn and Suites by Wyndham Cabot is listed with public access, and its status is available.

Where is Days Inn and Suites by Wyndham Cabot?

Days Inn and Suites by Wyndham Cabot is at 1302 West Locust Street, Cabot, AR 72023. Its coordinates are 34.98077, -92.03011.

More EV charging around Cabot

Working with Arkansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 391355, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Days Inn and Suites by Wyndham Cabot, Cabot, AR (AFDC station 391355)”, https://chargecensus.com/stations/arkansas/days-inn-and-suites-by-wyndham-cabot-391355 (data as of October 12, 2026).