Cadence Bank Rc 570 - 2
AvailableEV charging station in Little Rock, Arkansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 261273.
At a glance
Cadence Bank Rc 570 - 2 is a public EV charging station at 17900 Chenal Pkwy in Little Rock, Arkansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 24, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 261273 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 24, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 17900 Chenal Pkwy
- City
- Little Rock
- State
- Arkansas
- ZIP
- 72223
- Coordinates
- 34.76962, -92.45820
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Supercharger · Available
Tesla Destination · Available
Electrify America · Available
IONNA · Available
Tesla Destination · Available
What kind of charging does Cadence Bank Rc 570 - 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Arkansas average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cadence Bank Rc 570 - 2 compare with other stations in Little Rock?
Little Rock has 89 charging stations in the DOE registry with 230 ports, the most of 82 cities and towns in Arkansas. Cadence Bank Rc 570 - 2 accounts for under 1% of the charging ports in Little Rock. ChargePoint runs 52 stations in Little Rock. Statewide, Arkansas has 423 stations and 1,185 ports, the 37th-largest station count of the 51 states and DC. The biggest station in Arkansas, NARA Parking Deck in Bentonville, has 24 ports.
Who operates Cadence Bank Rc 570 - 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in Arkansas, 36% of the state's 423.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 24, 2023, one of 114 stations in Arkansas with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cadence Bank Rc 570 - 2 have?
Cadence Bank Rc 570 - 2 has 2 charging ports: 2 Level 2.
Does Cadence Bank Rc 570 - 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cadence Bank Rc 570 - 2 have?
Cadence Bank Rc 570 - 2 has J1772 connectors.
Is Cadence Bank Rc 570 - 2 open to the public?
Yes. Cadence Bank Rc 570 - 2 is listed with public access, and its status is available.
Where is Cadence Bank Rc 570 - 2?
Cadence Bank Rc 570 - 2 is at 17900 Chenal Pkwy, Little Rock, AR 72223. Its coordinates are 34.76962, -92.45820.
More EV charging around Little Rock
Working with Arkansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 261273, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cadence Bank Rc 570 - 2, Little Rock, AR (AFDC station 261273)”, https://chargecensus.com/stations/arkansas/cadence-bank-rc-570-2-261273 (data as of October 12, 2026).