ChargeCensus

Tuscanygp Tuscany 1

Available

EV charging station in Gilbert, Arizona on the ChargePoint network — 2 Level 2. US DOE AFDC station 405435.

At a glance

Tuscanygp Tuscany 1 is a public EV charging station at 3545 East Warner Road in Gilbert, Arizona, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 5, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID405435
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 5, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3545 East Warner Road
State
Arizona
ZIP
85296
Coordinates
33.33477, -111.71495

Within ~15 km

Nearby charging

What kind of charging does Tuscanygp Tuscany 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Tuscanygp Tuscany 1 compare with other stations in Gilbert?

Gilbert has 48 charging stations in the DOE registry with 159 ports, the 8th-most of 103 cities and towns in Arizona. Tuscanygp Tuscany 1 accounts for 1% of the charging ports in Gilbert. ChargePoint runs 26 stations in Gilbert. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates Tuscanygp Tuscany 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 902 of those stations are in Arizona, 54% of the state's 1,675.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 5, 2025, one of 286 stations in Arizona with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Tuscanygp Tuscany 1 have?

Tuscanygp Tuscany 1 has 2 charging ports: 2 Level 2.

Does Tuscanygp Tuscany 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Tuscanygp Tuscany 1 have?

Tuscanygp Tuscany 1 has J1772 connectors.

Is Tuscanygp Tuscany 1 open to the public?

Yes. Tuscanygp Tuscany 1 is listed with public access, and its status is available.

Where is Tuscanygp Tuscany 1?

Tuscanygp Tuscany 1 is at 3545 East Warner Road, Gilbert, AZ 85296. Its coordinates are 33.33477, -111.71495.

More EV charging around Gilbert

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 405435, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Tuscanygp Tuscany 1, Gilbert, AZ (AFDC station 405435)”, https://chargecensus.com/stations/arizona/tuscanygp-tuscany-1-405435 (data as of October 12, 2026).