ChargeCensus

The Tuxon Station 1

Available

EV charging station in Tucson, Arizona on the ChargePoint network — 2 Level 2. US DOE AFDC station 206479.

At a glance

The Tuxon Station 1 is a public EV charging station at 960 S Freeway in Tucson, Arizona, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 17, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID206479
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 17, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
960 S Freeway
City
Tucson
State
Arizona
ZIP
85745
Coordinates
32.20990, -110.98087

Within ~15 km

Nearby charging

What kind of charging does The Tuxon Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does The Tuxon Station 1 compare with other stations in Tucson?

Tucson has 195 charging stations in the DOE registry with 501 ports, the 2nd-most of 103 cities and towns in Arizona. The Tuxon Station 1 accounts for under 1% of the charging ports in Tucson. ChargePoint runs 118 stations in Tucson. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates The Tuxon Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 902 of those stations are in Arizona, 54% of the state's 1,675.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 17, 2022, one of 216 stations in Arizona with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Tuxon Station 1 have?

The Tuxon Station 1 has 2 charging ports: 2 Level 2.

Does The Tuxon Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does The Tuxon Station 1 have?

The Tuxon Station 1 has J1772 connectors.

Is The Tuxon Station 1 open to the public?

Yes. The Tuxon Station 1 is listed with public access, and its status is available.

Where is The Tuxon Station 1?

The Tuxon Station 1 is at 960 S Freeway, Tucson, AZ 85745. Its coordinates are 32.20990, -110.98087.

More EV charging around Tucson

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 206479, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Tuxon Station 1, Tucson, AZ (AFDC station 206479)”, https://chargecensus.com/stations/arizona/the-tuxon-station-1-206479 (data as of October 12, 2026).