ChargeCensus

Salt River Proj Srpzoo-L2-#01

Available

EV charging station in Phoenix, Arizona on the ChargePoint network — 2 Level 2. US DOE AFDC station 207172.

At a glance

Salt River Proj Srpzoo-L2-#01 is a public EV charging station at N Galvin Pkwy in Phoenix, Arizona, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 26, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID207172
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 26, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
N Galvin Pkwy
State
Arizona
ZIP
85008
Coordinates
33.45219, -111.94960

Within ~15 km

Nearby charging

What kind of charging does Salt River Proj Srpzoo-L2-#01 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Salt River Proj Srpzoo-L2-#01 compare with other stations in Phoenix?

Phoenix has 387 charging stations in the DOE registry with 1,012 ports, the most of 103 cities and towns in Arizona. Salt River Proj Srpzoo-L2-#01 accounts for under 1% of the charging ports in Phoenix. ChargePoint runs 238 stations in Phoenix. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates Salt River Proj Srpzoo-L2-#01?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 902 of those stations are in Arizona, 54% of the state's 1,675.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 26, 2022, one of 216 stations in Arizona with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Salt River Proj Srpzoo-L2-#01 have?

Salt River Proj Srpzoo-L2-#01 has 2 charging ports: 2 Level 2.

Does Salt River Proj Srpzoo-L2-#01 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Salt River Proj Srpzoo-L2-#01 have?

Salt River Proj Srpzoo-L2-#01 has J1772 connectors.

Is Salt River Proj Srpzoo-L2-#01 open to the public?

Yes. Salt River Proj Srpzoo-L2-#01 is listed with public access, and its status is available.

Where is Salt River Proj Srpzoo-L2-#01?

Salt River Proj Srpzoo-L2-#01 is at N Galvin Pkwy, Phoenix, AZ 85008. Its coordinates are 33.45219, -111.94960.

More EV charging around Phoenix

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 207172, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Salt River Proj Srpzoo-L2-#01, Phoenix, AZ (AFDC station 207172)”, https://chargecensus.com/stations/arizona/salt-river-proj-srpzoo-l2-01-207172 (data as of October 12, 2026).