ChargeCensus

Harper Build C North

Available

EV charging station in Tempe, Arizona on the ChargePoint network — 2 Level 2. US DOE AFDC station 166942.

At a glance

Harper Build C North is a public EV charging station at 1030 E Minton Dr in Tempe, Arizona, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 19, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID166942
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 19, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1030 E Minton Dr
City
Tempe
State
Arizona
ZIP
85282
Coordinates
33.37967, -111.92486

Within ~15 km

Nearby charging

What kind of charging does Harper Build C North offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Harper Build C North compare with other stations in Tempe?

Tempe has 117 charging stations in the DOE registry with 336 ports, the 4th-most of 103 cities and towns in Arizona. Harper Build C North accounts for under 1% of the charging ports in Tempe. ChargePoint runs 80 stations in Tempe. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates Harper Build C North?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 902 of those stations are in Arizona, 54% of the state's 1,675.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 19, 2020, one of 74 stations in Arizona with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Harper Build C North have?

Harper Build C North has 2 charging ports: 2 Level 2.

Does Harper Build C North have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Harper Build C North have?

Harper Build C North has J1772 connectors.

Is Harper Build C North open to the public?

Yes. Harper Build C North is listed with public access, and its status is available.

Where is Harper Build C North?

Harper Build C North is at 1030 E Minton Dr, Tempe, AZ 85282. Its coordinates are 33.37967, -111.92486.

More EV charging around Tempe

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 166942, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Harper Build C North, Tempe, AZ (AFDC station 166942)”, https://chargecensus.com/stations/arizona/harper-build-c-north-166942 (data as of October 12, 2026).