ChargeCensus

Hampton Prescot Right Station

Available

EV charging station in Prescott, Arizona on the ChargePoint network — 2 Level 2. US DOE AFDC station 195656.

At a glance

Hampton Prescot Right Station is a public EV charging station at 3453 Ranch Dr in Prescott, Arizona, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 8, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID195656
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 8, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3453 Ranch Dr
State
Arizona
ZIP
86303
Coordinates
34.54776, -112.40310

Within ~15 km

Nearby charging

What kind of charging does Hampton Prescot Right Station offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Hampton Prescot Right Station compare with other stations in Prescott?

Prescott has 17 charging stations in the DOE registry with 45 ports, the 17th-most of 103 cities and towns in Arizona. Hampton Prescot Right Station accounts for 4% of the charging ports in Prescott. ChargePoint runs 3 stations in Prescott. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates Hampton Prescot Right Station?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 902 of those stations are in Arizona, 54% of the state's 1,675.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 8, 2021, one of 273 stations in Arizona with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Hampton Prescot Right Station have?

Hampton Prescot Right Station has 2 charging ports: 2 Level 2.

Does Hampton Prescot Right Station have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Hampton Prescot Right Station have?

Hampton Prescot Right Station has J1772 connectors.

Is Hampton Prescot Right Station open to the public?

Yes. Hampton Prescot Right Station is listed with public access, and its status is available.

Where is Hampton Prescot Right Station?

Hampton Prescot Right Station is at 3453 Ranch Dr, Prescott, AZ 86303. Its coordinates are 34.54776, -112.40310.

More EV charging around Prescott

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 195656, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hampton Prescot Right Station, Prescott, AZ (AFDC station 195656)”, https://chargecensus.com/stations/arizona/hampton-prescot-right-station-195656 (data as of October 12, 2026).