ChargeCensus

Grand Canyon Plaza Hotel

Available

EV charging station in Grand Canyon Village, Arizona, not on a charging network — 4 Level 2. US DOE AFDC station 256120.

At a glance

Grand Canyon Plaza Hotel is a public EV charging station at 292 Canyon Plaza Ln in Grand Canyon Village, Arizona, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 9, 2023.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID256120
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityHotel
Open dateMar 9, 2023
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
292 Canyon Plaza Ln
City
Grand Canyon Village
State
Arizona
ZIP
86023
Coordinates
35.97256, -112.12841

Within ~15 km

Nearby charging

What kind of charging does Grand Canyon Plaza Hotel offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 28% above the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a hotel location.

How does Grand Canyon Plaza Hotel compare with other stations in Grand Canyon Village?

Grand Canyon Village has 7 charging stations in the DOE registry with 40 ports. Grand Canyon Plaza Hotel accounts for 10% of the charging ports in Grand Canyon Village. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates Grand Canyon Plaza Hotel?

Grand Canyon Plaza Hotel is listed as non-networked: its chargers are not run through a charging-network account. Arizona has 179 non-networked stations, 11% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 9, 2023, one of 228 stations in Arizona with a 2023 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Grand Canyon Plaza Hotel have?

Grand Canyon Plaza Hotel has 4 charging ports: 4 Level 2.

Does Grand Canyon Plaza Hotel have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Grand Canyon Plaza Hotel have?

Grand Canyon Plaza Hotel has J1772 connectors.

Is charging at Grand Canyon Plaza Hotel free?

Pricing as reported to the DOE registry: Free.

Is Grand Canyon Plaza Hotel open to the public?

Yes. Grand Canyon Plaza Hotel is listed with public access, and its status is available.

Where is Grand Canyon Plaza Hotel?

Grand Canyon Plaza Hotel is at 292 Canyon Plaza Ln, Grand Canyon Village, AZ 86023. Its coordinates are 35.97256, -112.12841.

More EV charging around Grand Canyon Village

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 256120, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Grand Canyon Plaza Hotel, Grand Canyon Village, AZ (AFDC station 256120)”, https://chargecensus.com/stations/arizona/grand-canyon-plaza-hotel-256120 (data as of October 12, 2026).