ChargeCensus

Adoa Utilities South 15th Ave

Available

EV charging station in Phoenix, Arizona on the ChargePoint network — 2 Level 2. US DOE AFDC station 164787.

At a glance

Adoa Utilities South 15th Ave is a public EV charging station at 15 S 15th ave in Phoenix, Arizona, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 1, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID164787
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 1, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
15 S 15th ave
State
Arizona
ZIP
85007
Coordinates
33.44755, -112.09086

Within ~15 km

Nearby charging

What kind of charging does Adoa Utilities South 15th Ave offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the Arizona average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Adoa Utilities South 15th Ave compare with other stations in Phoenix?

Phoenix has 387 charging stations in the DOE registry with 1,012 ports, the most of 103 cities and towns in Arizona. Adoa Utilities South 15th Ave accounts for under 1% of the charging ports in Phoenix. ChargePoint runs 238 stations in Phoenix. Statewide, Arizona has 1,675 stations and 5,223 ports, the 19th-largest station count of the 51 states and DC. The biggest station in Arizona, Quartzsite, AZ - Main Event Ln - Tesla Supercharger in Quartzsite, has 84 ports.

Who operates Adoa Utilities South 15th Ave?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 902 of those stations are in Arizona, 54% of the state's 1,675.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 1, 2020, one of 74 stations in Arizona with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Adoa Utilities South 15th Ave have?

Adoa Utilities South 15th Ave has 2 charging ports: 2 Level 2.

Does Adoa Utilities South 15th Ave have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Adoa Utilities South 15th Ave have?

Adoa Utilities South 15th Ave has J1772 connectors.

Is Adoa Utilities South 15th Ave open to the public?

Yes. Adoa Utilities South 15th Ave is listed with public access, and its status is available.

Where is Adoa Utilities South 15th Ave?

Adoa Utilities South 15th Ave is at 15 S 15th ave, Phoenix, AZ 85007. Its coordinates are 33.44755, -112.09086.

More EV charging around Phoenix

Working with Arizona charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 164787, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Adoa Utilities South 15th Ave, Phoenix, AZ (AFDC station 164787)”, https://chargecensus.com/stations/arizona/adoa-utilities-south-15th-ave-164787 (data as of October 12, 2026).