ChargeCensus

EV charging in Chantilly, VA

24 charging stations in Chantilly, Virginia — networks, port mixes and a page for every station.

Dataset updated . Refreshed weekly from the US DOE Alternative Fuels Data Center.

At a glance

Chantilly, Virginia has 24 EV charging stations in the US DOE registry (22 public) with 75 charging ports: 17 DC fast and 58 Level 2. That is the 22nd-most of 228 cities and towns in Virginia. ChargePoint runs the most stations here (10).

Stations
24
Public
22
DC fast ports
17
Level 2 ports
58

Port ranking

Biggest stations in Chantilly

#StationPortsNetwork
1The Community of Cedar LakesAvailable6Blink
2IADWF - 14750 Conference Center DrAvailable6EV Connect
3Walmart 5969 (Chantilly, VA)Available4Electrify America
4Enterprise CourtAvailable4Non-networked
5Sheetz #304Available4EVgo
6The Field at CommonwealthAvailable4EVgo
7Quest Diagnostics - ChantillyAvailable4Blink
8KBR - Chantilly, VAAvailable4Blink
950250Available4Blink
10G&C Juice BarAvailable4Non-networked
11Ted Britt FordAvailable4Ford Charge
12Priority Nissan - ChantillyAvailable3Non-networked
13Victory Point VictoryAvailable2ChargePoint
14Pohanka Lexus Lxs Cust LotAvailable2ChargePoint
15Gallery Park Gallery Park 1Available2ChargePoint

🔒 Create a free account to export CSV — all 24 in Chantilly · already signed in? Export from your account →

Operators

Networks here

Growth

Stations opened by year

2011
1
2013
1
2017
1
2019
1
2020
2
2021
2
2022
1
2023
3
2024
6
2026
6

How many public EV charging stations are in Chantilly?

Of the 24 stations the registry lists in Chantilly, 22 are open to the public and 2 are private (fleet, workplace or residential). The average station here has 3.1 ports, roughly in line with the Virginia average of 3.3. Chantilly holds 1% of Virginia's 2,079 charging stations.

Where is DC fast charging in Chantilly?

Chantilly has 17 DC fast ports (often called Level 3 charging) at 5 public stations. The largest are Walmart 5969 (Chantilly, VA) (4 DC fast), Sheetz #304 (4 DC fast), The Field at Commonwealth (4 DC fast) and Ted Britt Ford (4 DC fast). Across the public stations, 4 list CCS, 5 list NACS (Tesla) and 3 list CHAdeMO connectors.

What kinds of places have EV chargers in Chantilly?

Where the registry records the site type, the most common hosts are place of worship (1), auto repair (1), public site (1) and car dealership (1). 4 public stations list their pricing as free in the registry.

Which charging networks operate in Chantilly?

By station count, the networks in Chantilly are led by ChargePoint (10), Blink (4), EVgo (2) and Electrify America (1). 4 stations are non-networked. 8 networks in all have stations here.

How fast is EV charging growing in Chantilly?

The earliest station open year on record in Chantilly is 2011. 0 stations opened in 2025, compared with 6 in 2024. 6 more have opened so far in 2026.

Directory

All 22 public charging stations in Chantilly

Frequently asked questions

How many EV charging stations are in Chantilly, VA?

The US DOE registry lists 24 charging stations in Chantilly, Virginia (22 public), with 75 charging ports: 17 DC fast and 58 Level 2.

Where can I fast-charge in Chantilly?

Chantilly has 17 DC fast ports. The biggest DC fast sites are Walmart 5969 (Chantilly, VA) (4 ports), Sheetz #304 (4 ports) and The Field at Commonwealth (4 ports).

Which charging networks operate in Chantilly?

By station count: ChargePoint (10), Non-networked (4), Blink (4), EVgo (2) and Electrify America (1).

Is there free EV charging in Chantilly?

4 public stations in Chantilly list their pricing as free in the DOE registry. Pricing is self-reported by the site and can change.

More EV charging near Chantilly

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “EV charging in Chantilly, VA”, https://chargecensus.com/ev-charging/virginia/chantilly (data as of October 12, 2026).