ChargeCensus

EV charging in Northfield, MN

12 charging stations in Northfield, Minnesota — networks, port mixes and a page for every station.

Dataset updated . Refreshed weekly from the US DOE Alternative Fuels Data Center.

At a glance

Northfield, Minnesota has 12 EV charging stations in the US DOE registry (12 public) with 29 charging ports: 5 DC fast and 24 Level 2. That is the 21st-most of 218 cities and towns in Minnesota. ChargePoint runs the most stations here (8).

Stations
12
Public
12
DC fast ports
5
Level 2 ports
24

Port ranking

Biggest stations in Northfield

#StationPortsNetwork
1Fairfield Inn & Suites by Marriott NorthfieldAvailable4Non-networked
2Flying J 576Available4EVgo
3Hanappe Ranch - Tesla DestinationAvailable4Tesla Destination
4Carleton James Hall EastAvailable2ChargePoint
5City Of Nfld Station 1Available2ChargePoint
6City Of Nfld Station 2Available2ChargePoint
7Northfield Hosp Station #1Available2ChargePoint
8Carleton James Hall WestAvailable2ChargePoint
9St Olaf College TownhomesAvailable2ChargePoint
10St Olaf College BuntrockAvailable2ChargePoint
11Carleton 1974 BuildingAvailable2ChargePoint
12Sota ChevyAvailable1Synergev

🔒 Create a free account to export CSV — all 12 in Northfield · already signed in? Export from your account →

Operators

Networks here

Growth

Stations opened by year

2012
1
2019
1
2020
2
2021
1
2022
3
2024
1
2025
2
2026
1

How many public EV charging stations are in Northfield?

All 12 stations the registry lists in Northfield are open to the public. The average station here has 2.4 ports, about 15% below the Minnesota average of 2.8. Northfield holds under 1% of Minnesota's 1,226 charging stations.

Where is DC fast charging in Northfield?

Northfield has 5 DC fast ports (often called Level 3 charging) at 2 public stations. The largest are Flying J 576 (4 DC fast) and Sota Chevy (1 DC fast). Across the public stations, 2 list CCS and 1 lists NACS (Tesla) connectors.

What kinds of places have EV chargers in Northfield?

Where the registry records the site type, the most common hosts are hotel (1). 1 public station in Northfield is tagged as a hotel or inn in the registry: Fairfield Inn & Suites by Marriott Northfield. 2 public stations list their pricing as free in the registry.

Which charging networks operate in Northfield?

By station count, the networks in Northfield are led by ChargePoint (8), EVgo (1), Synergev (1) and Tesla Destination (1). 1 station is non-networked. 5 networks in all have stations here.

How fast is EV charging growing in Northfield?

The earliest station open year on record in Northfield is 2012. 2 stations opened in 2025, compared with 1 in 2024. 1 more have opened so far in 2026.

Frequently asked questions

How many EV charging stations are in Northfield, MN?

The US DOE registry lists 12 charging stations in Northfield, Minnesota (12 public), with 29 charging ports: 5 DC fast and 24 Level 2.

Where can I fast-charge in Northfield?

Northfield has 5 DC fast ports. The biggest DC fast sites are Flying J 576 (4 ports) and Sota Chevy (1 port).

Which charging networks operate in Northfield?

By station count: ChargePoint (8), Non-networked (1), EVgo (1), Synergev (1) and Tesla Destination (1).

Which hotels in Northfield have EV charging?

Fairfield Inn & Suites by Marriott Northfield is tagged as a hotel or inn with public EV charging in the DOE registry. Many hotel chargers carry no site tag, so the full station list on this page may include more.

Is there free EV charging in Northfield?

2 public stations in Northfield list their pricing as free in the DOE registry. Pricing is self-reported by the site and can change.

More EV charging near Northfield

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “EV charging in Northfield, MN”, https://chargecensus.com/ev-charging/minnesota/northfield (data as of October 12, 2026).